Unit: 1 Box | Shipping Weight: 168 g | Stock Available: 2 unit | Sold:2unit |
0 - 4 | 5 - 9 | 10 - 14 | 15+ | |
---|---|---|---|---|
US $3.25 | US $3.09 | US $2.93 | US $2.60 | US $3.25 |
Color | Green |
Material | Wood |
Color Treatment | Dyed |
Usage | Beads |
Hole Style | Center Drilled |
Shape | Oval |
Brand | PANDAHALL ELITE |
Feature | Wood+Desiccant |
Size:
Round: about 6x4~5mm, Hole: 2mm, about 120pcs;
Round: about 8x7mm, Hole: 3mm, about 120pcs;
Round: about 10x9mm, Hole: 3mm, about 120pcs;
Oval/Oblong: about 23x8~9mm, Hole: 2.5mm, about 120pcs;
Box: 22x16x1.5cm, 1pc.
Priced per 1 Box
1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
2. The size of the image should be less than 5M!
3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.
1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
2. The size of the image should be less than 5M!
3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.
Uploading File